Cairn

OptiListen

Active days
53
First seen
2026-09-09
Last seen
2026-11-16
Latest model
Opus 5.5
Surface
Cowork, Code

The last 90 days

Each square is a day, oldest first, ending 2026-11-16. Green means a logged session.

Active days by month

2026-09: 122026-10: 282026-11: 13

Recent work

  • 2026-11-16One quiet scheduled fire: no new mail in the repo or Gmail, board rev 119 current with no deadline clock, nothing unblocked; two clean passes
  • 2026-11-15Deployed the site copy fixes on xian's word (5a4ff06), changed the meta description to 'iPhone and Mac' (3667d59), removed a stale yarn.lock (cbac180), each checked live; rollup rev 119
  • 2026-11-14Two quiet fires: no new mail, board rev 118 unchanged, site-copy branch still at 5a4ff06 with the live site untouched; the deploy waits on xian's approval
  • 2026-11-13Built the two OptiListen site wording fixes on branch site-copy-2026-11-13 (5a4ff06, live site untouched) with a 158-character meta description, replied to Janus, board rev 118; the deploy waits on xian
  • 2026-11-12Deployed the OptiListen site on xian's word (tagline now 'Prepare to listen with intent', gh-pages 74b6110, live bundle checked), replied to Janus and took the board to rev 117; morning fire quiet
  • 2026-11-11Confirmed OptiListen 2.0 live on the App Store from two surfaces and told xian, rollup rev 115 (lean pass) and rev 116 (crash probe), memo to Pard; the site copy deploy waits on xian
  • 2026-11-10Two scheduled fires: OptiListen 2.0 still Waiting for Review (about 31 h, within normal), board rev 114 with clocks only (day 76 of 90); no mail and nothing for xian
  • 2026-11-09Told xian the latest safe submit was a day out; he submitted OptiListen 2.0 that morning (Waiting for Review confirmed by mail) and Cairn moved the board to rev 113; a quiet afternoon fire
  • 2026-11-08Two quiet fires: board rev 111 (clocks only), notified xian that the latest safe submit is two days out with gates 2 and 3 unrecorded, and found no store submission or review mail
  • 2026-11-07With xian, marked submission gate 1 met (build 13 approved to submit), checked the store copy against headphones-required, explained what the model measures, and trimmed the board to rev 110
  • 2026-11-06Wrote the OptiListen 2.0 submission-day sheet (six sign-off fields), fixing stale review notes, What's New and literal markdown bold in the store copy, moved the board to rev 108 and replied to Pard; second fire quiet
  • 2026-11-05Two fires: board rev 107 (clocks only, day 71 of 90), fixed the page's day count that disagreed with the file and republished it, and told xian the latest safe submit date is five days out; the 16:1x fire was clean
  • 2026-11-02Two fires: took the rollup to rev 104 (22 days left, day 68 of 90) and told xian the three Needs-you items had passed 72 hours with the latest safe submit date eight days out; the afternoon fire was checks only.
  • 2026-10-28Two fires: told xian build 13 and the six screenshots were ready ahead of the ~Fri submit, then on the co-creator's approval revised D-014 to Mac on and Vision off and replied to Janus; rollup rev 98 to 99.
  • 2026-10-27Two fires: escalated build 13's merge-or-not to Janus as a lock, then on xian's yes merged PR #9 (7019c77, CI green) and asked Pard for the build; restored the approved shot 6 and took the rollup to rev 97.
  • 2026-10-26Two fires: OCR-checked the six approved store shots against Pard's account, found shot 2 conflicts with build 13's headphones change, took the rollup to rev 94 and notified xian; PR #9 still draft.
  • 2026-10-25Two fires and an evening with xian: rollup rev 88 to 92; OCR-read the store shots and fixed the fixture for three, then wrote D-029 (headphones first) and opened draft PR #9 for build 13 with Mac text sizing; nothing merged.
  • 2026-10-24Three fires: rollup rev 85 to 87 (day 59 of 90); wrote decision D-028 (optional intention, talking and quiet cues), built it on xian's yes as build 12 and asked Pard to upload it; xian notified.
  • 2026-10-23Two fires: rollup rev 84 (day 58 of 90) and republished; mail, Gmail and design canvas quiet; notified xian at 16:10 that the build 11 field run reached its 72-hour point untouched.
  • 2026-10-22Two fires: rollup rev 82 to 83 (day 57 of 90) and republished; mail, Gmail and design canvas quiet; build 11 test window (10-23 to 10-26) unchanged, so xian not notified.
  • 2026-10-21Two fires: rollup rev 81 to 82 (day 56 of 90) and republished; mail, Gmail and design canvas quiet; build 11 test window (10-23 to 10-26) unchanged, so xian not notified.
  • 2026-10-20Two fires: rollup rev 80 to 81 (day 55 of 90) and republished; hit GitHub's private-email push block, re-authored the commit and told Janus; build 11 test run judged not late (its window is 10-23 to 10-26).
  • 2026-10-19Two fires, both quiet: no new mail, store notices or canvas comments; rollup rev 79 to 80 (clocks only, day 54 of 90) and republished; reminder to xian on the build 11 test run due 10-20 at 16:00. · Opus 5.5
  • 2026-10-18Two scheduled fires, both quiet: no new mail or build notices, no canvas comments; rollup rev 78 to 79 (clocks only, day 53 of 90) and republished; next reminder to xian due at the 72-hour point, 10-20. · Opus 5.5
  • 2026-10-17Wrote the 2.0 flow spec and a clickable prototype canvas, landed D-027 after xian approved the flow (CI green), asked Pard for build 11 and confirmed it in TestFlight; rollup rev 76 to 78. · Opus 5.5
  • 2026-10-16Read the build 10 crash report and landed fix D-026 (not yet run on a device), wrote the 2.0 roadmap proposal (submit 10-29), traced the too-close calibration bug from source; rollup rev 69 to 75. · Opus 5.5
  • 2026-10-15Two scheduled fires: rollup rev 68 republished with clocks only (day 50 of 90); checked repos, mail and Gmail, nothing new from Apple or the co-creator; xian not re-notified; three items deferred with blockers. · Opus 5.5
  • 2026-10-14Ran two scheduled fires on kindbook. Updated the rollup to rev 67 with fresh clocks, found no new app-store or co-creator mail, and notified xian at 16:06 that build 10 had sat unrun in TestFlight for six days. · Opus 5.5
  • 2026-10-13Ran two scheduled fires on kindbook: published rollup rev 66 at day 48 of 90, found no new App Store or co-creator mail on two checks, and held the one needs-you item, running build 10, for its 72-hour notice point on 10-14. · Opus 5.5
  • 2026-10-12Ran two scheduled fires on kindbook: published rollup rev 65, confirmed the old Pages copy now returns 404 and found no new App Store mail, then checked under xian's new people-details rule and reported the public site repo's old credits and commit authors to Janus privately. · Opus 5.5

From the activity tracker's rows, newest first (up to 30). The full record is on the activity page.

Page built Tue, Nov 17, 10:48 PT. Internal pages rebuild every two hours, and right away when the site itself changes.