Docs

Piper Morgan

Active days
205
First seen
2026-03-01
Last seen
2026-11-16
Latest model
Sonnet 5.5
Surface
Code

The last 90 days

Each square is a day, oldest first, ending 2026-11-16. Green means a logged session.

Active days by month

2026-03: 192026-04: 262026-05: 272026-06: 182026-07: 72026-08: 312026-09: 302026-10: 312026-11: 16

Recent work

  • 2026-11-16Landed the 11-15 omnibus, ran guide steps 1-4 and 8 from a fresh clone (findings led to #2386 and the seat rule), named services in bare compose commands across eight docs, freed 6.4 GB for Pard · Sonnet 5.5
  • 2026-11-15Landed the 11-14 omnibus (11 of 11 markers), renamed the four tester pages to BETA_, published and distributed 'No New Skills This Time', recorded four Tier 1 approvals, wrote the checker's no-history error (569a88d668) · Sonnet 5.5
  • 2026-11-14Landed the 11-13 omnibus (commit recount matched, two plain-line day closes flagged to Arch and CIO), published and distributed 'Which Agent Did It?' (blog, LinkedIn, Medium), answered xian's alpha-doc rename question · Sonnet 5.5
  • 2026-11-13Landed the 11-12 omnibus, built the Tier 1 manifest and its --deploy checker to Arch's rules, drafted known-limits.md and the wont-do, cant-read and stance items (CXO passed), recorded xian's ethics-default yes · Sonnet 5.5
  • 2026-11-12Landed the 11-11 omnibus, drafted the self-host guide and fixed seven key-setup pages (key-in-docs lint to 0), then published 'The Server Has No Key' at 22:12 on Comms' ready memo, Medium only · Sonnet 5.5
  • 2026-11-11Landed the 11-10 omnibus through a verified subagent, published Weekly Ship #068 at about 16:10 on Comms' ready memo and set it distributed with xian's LinkedIn URL; mailed Lead the evening concept-link red · Sonnet 5.5
  • 2026-11-10Landed the 11-09 omnibus (228 commits, 11 of 11 markers), reported a Fly staging deploy red that proved transient, then published Never Green in a Thousand Runs on Comms' late memo and marked it distributed · Sonnet 5.5
  • 2026-11-09Landed the 11-08 omnibus (476 commits, subagent draft verified), ran and closed weekly audit #2332 (0 broken links, 27 of 39 docs flagged for drift), and sent its first mail v4 reply after acking CIO's test · Sonnet 5.5
  • 2026-11-08Landed the 11-07 omnibus (790 commits, subagent draft verified), published When Accuracy Scores Worse on Comms' publish-ready and set it distributed with both URLs, and read a link-checker red as an outside flake · Sonnet 5.5
  • 2026-11-07Committed the 11-06 omnibus, published At Long Last, Beta and fixed its category to insight, added a weekday slot check to the validator and a slots table to the briefing, and flagged a gated Fly deploy red · Sonnet 5.5
  • 2026-11-06Committed the 11-05 omnibus (514 commits) and resolved Exec's two flags, answered Agent 360 v0.6 and CIO's staleness items, ran the merge-keeper sweep of 18 Lead branches, and read three Exec rulings with no objection · Sonnet 5.5
  • 2026-11-05Committed the 11-04 omnibus, published "Don't Overpromise" at 18:48 and set it distributed on xian's Medium URL, confirmed Ship #067's LinkedIn URL was already filled, and tracked the link checker from red (site outage) back to green · Sonnet 5.5
  • 2026-11-04Committed the 11-03 omnibus, published Weekly Ship #067 at 19:49 and set it distributed at 20:01, moved The Unguarded Entrance to distributed on xian's Medium-only correction, and added four planned calendar rows (475, validator clean) · Sonnet 5.5
  • 2026-11-03Wrote the 11-02 omnibus (201 lines, 919 commits), published The Unguarded Entrance at 14:07 once Comms sent its ready memo and recorded the Medium URL, and added Concept lines to two of its scripts (ratchet 251 to 249); the LinkedIn URL is still owed. · Sonnet 5.5
  • 2026-11-02Installed the 11-01 omnibus (592 commits), closed the monthly #2252 and weekly #2253 audits (13 files archived, 134 stale candidates and 114 inactive issues reviewed), closed #1710 and #1683, removed two never-published calendar rows on xian's word, and passed the piper-guards 0.2.2 probe. · Sonnet 5.5
  • 2026-11-01Wrote the 10-31 omnibus (410 lines), published Check the Machine First, swapped its wrong art at 11:02, recorded the Medium and LinkedIn URLs as distributed, added the v0.9.0.0 release URL, closed #1392, filed #2249, and rewrote its own omnibus note to say CIO's link reading was right. · Sonnet 5.5
  • 2026-10-31Published and distributed Build the Instrument Before the Theory, wrote the 10-30 omnibus (485 lines, 19 rows), landed the 0.9.0.0 release notes and eight phase-3 docs, closed #1927, #1779, #1721, #1403, #1780, #1904, #1719, #1389 and #1726, and iceboxed eight issues. · Sonnet 5.5
  • 2026-10-30Wrote the 10-29 omnibus (444 lines, 1,246 commits) with a CXO addendum and 15 activity rows, added five production-plan pointers to its briefing, and after MVP closed rewrote two stale current-state lines; the Ongoing triage still waits on xian. · Sonnet 5.5
  • 2026-10-29Wrote the 10-28 omnibus (482 lines, 427 commits) with two addenda, published Citation via Hearsay (Medium crosspost waits on xian), closed #1369 and #1940, and sent a triage of the 57-issue Ongoing milestone for xian's yes. · Sonnet 5.5
  • 2026-10-28Wrote the 10-27 omnibus (457 lines, 278 commits) with Exec's addendum, published Weekly Ship #066 and distributed it with xian's one edit, and pre-flighted and dry-ran Citation via Hearsay for its 10-29 date. · Sonnet 5.5
  • 2026-10-27Wrote the 10-26 omnibus (487 lines, 264 commits) with 11 activity rows and an addendum from Exec's answers, published then distributed The Caveat That Kept Disappearing, and added a HELD/WIP guard to the merge-keeper sweep. · Sonnet 5.5
  • 2026-10-26Wrote the 10-25 omnibus (505 lines, 502 commits) with 11 activity rows plus an addendum from Exec's answers, ran and closed weekly audit #2180 (0 broken links), sent PPM a roadmap-age report, and ran four quiet fires. · Sonnet 5.5
  • 2026-10-25Committed the 10-24 omnibus (528 lines, 589 commits) with 11 activity rows, published and distributed Sunday's post, pre-flighted and dry-ran Tuesday's post (waits for its date), filed the rule 8 memos, and ran five quiet fires. · Sonnet 5.5
  • 2026-10-24Nudged CXO to close its 10-23 log, committed the 10-23 omnibus (596 lines, 1017 commits) with 11 activity rows, sent Exec the rule 8 report, published and distributed Saturday's post, and ran four quiet fires. · Sonnet 5.5
  • 2026-10-23Committed the 10-22 omnibus (725 commits) with HOST's addendum and 11 activity rows, nudged HOST to close its 10-22 log, filed its Ship #066 workstream review, and ran five quiet fires; Inset waits for Saturday. · Sonnet 5.5
  • 2026-10-22Committed the 10-21 omnibus with HOST's addendum, published The Tracker That Lost Track and distributed it on Medium, fixed the Sunday 10-18 footer tease on the live site, and ran five quiet fires. · Sonnet 5.5
  • 2026-10-21Committed the 10-20 omnibus and closed HOST's day with an addendum, published Weekly Ship #065 and distributed it, and filed Web's deploy-lag notes (a Vercel-side delay, not its own retrigger, recovered the page). · Sonnet 5.5
  • 2026-10-20Committed the 10-19 omnibus with 11 activity rows and a HOST addendum, published The Phantom Feature (website cb7b254, category corrected to building) and set it distributed after the Medium crosspost. · Sonnet 5.5
  • 2026-10-19Committed the 10-18 omnibus with 11 activity rows plus Web and HOST addenda (all 11 logs closed), ran and closed weekly audit #2084 (0 of 69 links broken, 32 stale docs flagged), and refreshed the briefing MVP line. · Sonnet 5.5
  • 2026-10-18Published and distributed Measure the Start, committed the 10-17 omnibus with 11 activity rows and an all-closed addendum, nudged four unclosed 10-17 logs (all since closed), and noted Ship #065. · Sonnet 5.5

From the activity tracker's rows, newest first (up to 30). The full record is on the activity page.

Page built Tue, Nov 17, 10:48 PT. Internal pages rebuild every two hours, and right away when the site itself changes.